This is the official web blog for Kenthill Townhomes. We are near SE 256th St and 108 Ave SE in Kent, WA 98030. The purpose of this webblog is to improve communication at Kenthill Townhomes. I will be posting information, questions & answers, and photographs. Be sure to click on "Archives" for previous months postings. This website was first installed in 2005. It being 2010, I felt it was time to make some upgrades (style, color, format, etc.). Try using the new search field!
Search this blog!
Thursday, May 07, 2015
Thursday, April 30, 2015
Monday, April 20, 2015
Monday, April 13, 2015
Fence replacement near Building M
This is a picture of the replacement fence being installed near the east side of Building M. The contractor is just finishing up the work, and the job should be completed soon.
Sunday, March 22, 2015
2015 Annual Meeting
It is a known fact that for decades, the Kenthill Townhomes Annual Meetings are always held in March, coinciding with the date of typically held monthly homeowners meetings, that being the 4th Monday of the month.
[So, during any given month, the month homeowners meetings are held on the fourth Monday of the month, at 7:00PM, in the Cabana].
The 2015 Kenthill Townhomes Annual Meeting will be held at 7:00PM in the Cabana on March 23, 2015.
Homeowners are urged to sign proxies if they are unable to attend.
[So, during any given month, the month homeowners meetings are held on the fourth Monday of the month, at 7:00PM, in the Cabana].
The 2015 Kenthill Townhomes Annual Meeting will be held at 7:00PM in the Cabana on March 23, 2015.
Homeowners are urged to sign proxies if they are unable to attend.
Tuesday, February 24, 2015
2015 Halogen lights
Various halogen light repairs and adjustments were accomplished throughout the Kenthill Townhomes condominium complex.
Saturday, January 31, 2015
2015 beauty bark discussion
The subject of beauty bark came up at our November homeowners meeting.
I had a conversation with our Landscaping Foreman, Rick Lack. One of the topics we discussed was the subject of beauty bark. I know we have been over this issue several times before in years past. I have been on the Board since 2002. Since then, we have had beauty bark installed ion the property every three years.
Rich Lack has been over the benefits of beauty bark with current and past Boards. But I asked him to review the benefits with me again. Then I went upstairs and typed them out. Here they are.
Beauty bark:
1. Improves the aesthetic appearance.
2. Provides an amount of cover during the summer months.
(a) Protection from ultraviolet sunshine; tough on exposed roots.
(b) Helps retain moisture. Even a little moisture retained is better than none; esp. since we do not water our landscaped areas.
(c) Retards the growth of weeds. The is especially true during the first year after application.
3. Provides an amount of cover during the winter months.
(a) Although only a small amount, the beauty bark does in fact act like an insulator. Not for warmth, but preventing even lower temperatures that can cause further damage [The surface ground can't get lower than 32 degrees (freezing point)].
4. Eventually breaks down over the course of several years, providing a measure of nutrients to the soil which helps the trees and shrubs stay healthy.
From Wikipedia:
Like many other types of mulch, barkdust is used in gardening and landscaping for its properties in affecting soil pH, in regulating the temperature of the underlying soil, and preventing water loss and erosion.
Barkdust increases soil acidity, and the decomposition of barkdust consumes nitrogen, especially when fine bark mulch is mixed in with soil; coarser barkdust laid on top of soil will extract nitrogen at a much slower rate. Barkdust is also effective at absorbing water and preventing water loss due to evaporation.
I had a conversation with our Landscaping Foreman, Rick Lack. One of the topics we discussed was the subject of beauty bark. I know we have been over this issue several times before in years past. I have been on the Board since 2002. Since then, we have had beauty bark installed ion the property every three years.
Rich Lack has been over the benefits of beauty bark with current and past Boards. But I asked him to review the benefits with me again. Then I went upstairs and typed them out. Here they are.
Beauty bark:
1. Improves the aesthetic appearance.
2. Provides an amount of cover during the summer months.
(a) Protection from ultraviolet sunshine; tough on exposed roots.
(b) Helps retain moisture. Even a little moisture retained is better than none; esp. since we do not water our landscaped areas.
(c) Retards the growth of weeds. The is especially true during the first year after application.
3. Provides an amount of cover during the winter months.
(a) Although only a small amount, the beauty bark does in fact act like an insulator. Not for warmth, but preventing even lower temperatures that can cause further damage [The surface ground can't get lower than 32 degrees (freezing point)].
4. Eventually breaks down over the course of several years, providing a measure of nutrients to the soil which helps the trees and shrubs stay healthy.
From Wikipedia:
Like many other types of mulch, barkdust is used in gardening and landscaping for its properties in affecting soil pH, in regulating the temperature of the underlying soil, and preventing water loss and erosion.
Barkdust increases soil acidity, and the decomposition of barkdust consumes nitrogen, especially when fine bark mulch is mixed in with soil; coarser barkdust laid on top of soil will extract nitrogen at a much slower rate. Barkdust is also effective at absorbing water and preventing water loss due to evaporation.
Sunday, December 21, 2014
Two excerpts from a letter from the Board
A letter from the Board of Directors was recently mailed to all 82 Kenthill Townhomes homeowners.
Below are two paragraphs from that letter:
"Worked with contractors to install a new roof at one building. The Kenthill Townhomes Roof Installation Project began in 2003. We have 15 buildings. The plan was to have two new roofs installed, each year, until the project was completed. But some timeouts occurred over the years. Some wood siding dry rot issues had to be addressed at certain buildings. Building J was the last building. So this marks the conclusion of the project. It should be noted that for Kenthill Townhomes, unlike numerous other condominium complexes throughout the area, Special Assessments (often used for projects such as this one) are very rare, (the last one being in 2002)."
"The Board has been doing everything it can to not raise the homeowner dues. It should be noted that the Property Management Company has recommended raising the dues for many years now, as has the company that performs the Reserve Study. The last increase in the homeowners dues was in 2010, when a 5% increase was enacted. Since then, all major and minor projects have been accomplished with no increase in the monthly dues, and with no special assessments. This has been a major accomplishment, and a feat not likely to be matched by other condominium complexes throughout the City of Kent area."
Below are two paragraphs from that letter:
"Worked with contractors to install a new roof at one building. The Kenthill Townhomes Roof Installation Project began in 2003. We have 15 buildings. The plan was to have two new roofs installed, each year, until the project was completed. But some timeouts occurred over the years. Some wood siding dry rot issues had to be addressed at certain buildings. Building J was the last building. So this marks the conclusion of the project. It should be noted that for Kenthill Townhomes, unlike numerous other condominium complexes throughout the area, Special Assessments (often used for projects such as this one) are very rare, (the last one being in 2002)."
"The Board has been doing everything it can to not raise the homeowner dues. It should be noted that the Property Management Company has recommended raising the dues for many years now, as has the company that performs the Reserve Study. The last increase in the homeowners dues was in 2010, when a 5% increase was enacted. Since then, all major and minor projects have been accomplished with no increase in the monthly dues, and with no special assessments. This has been a major accomplishment, and a feat not likely to be matched by other condominium complexes throughout the City of Kent area."
Monday, November 03, 2014
Money, monthly assessments, delinquencies, etc.
The last increase in the homeowners dues was in 2010, when a 5% increase was enacted. Since then, all major and minor projects have been accomplished with no increase in the monthly dues, and with no special assessments.
[Try that, when comparing us to other condominium complexes throughout the area].
Compared to 2010, when delinquencies were at an astonishing high of $92,087.80 - the Association has reduced that figure to a new all-time low of $4,975.12, as of July 2014.
[Try that, when comparing us to other condominium complexes throughout the area].
Compared to 2010, when delinquencies were at an astonishing high of $92,087.80 - the Association has reduced that figure to a new all-time low of $4,975.12, as of July 2014.
Sunday, October 05, 2014
Incoming fresh water pipe break [with video]
This is what was discovered at approximately 7:00AM this morning:
https://www.youtube.com/watch?v=7VG4jwMhezQ
https://www.youtube.com/watch?v=7VG4jwMhezQ
Wednesday, October 01, 2014
Fence re-installation
The City of Kent is finishing the widening of SE 256th Street (estimated to be concluded by the end of the year). The fence that runs east and west on the south side of Building A was removed in March of 2013, so that the sidewalk could eventually be installed (after the street was widened). It is now time to re-install Kenthill Townhomes' fence (it had been rolled up and stored in the back yard).
Monday, September 22, 2014
Friday, September 12, 2014
2014 Retaining Wall Project
In the 1970's, when Kenthill Townhomes was built, a retaining wall was installed near the front of Building N. The retaining wall was constructed using railroad ties. Railroad ties can last a very long time. However, eventually they do deteriorate over time.
The old retaining wall was removed and a new retaining wall was installed in its place this month.
The old retaining wall was removed and a new retaining wall was installed in its place this month.
Sunday, August 31, 2014
Saturday, August 23, 2014
Street closing
The City of Kent contacted the Assistant Manager of Easthill Apartments. They gave her this (see above).
106th Avenue S. is the southern entrance to our property. This letter is saying that it will be closed Monday, Tuesday, and Wednesday.
It is difficult to tell, but I expect 116 Avenue SE will be closed as well. This implies that the only way to enter the Easthill and Kenthill property plat will be to use the eastern entrance which is located along 109th Avenue SE.
106th Avenue S. is the southern entrance to our property. This letter is saying that it will be closed Monday, Tuesday, and Wednesday.
It is difficult to tell, but I expect 116 Avenue SE will be closed as well. This implies that the only way to enter the Easthill and Kenthill property plat will be to use the eastern entrance which is located along 109th Avenue SE.
Thursday, August 21, 2014
Sunday, July 27, 2014
2014 Fence Repaired
The fence that runs east and west on our property [along SE 254th Place (near Building E, Unit E-1)] has been repaired.
Thursday, June 19, 2014
2014 Lawn Repair Project
The grass lawn area that is located in the back yards of Buildings O, P, Q, and R was hard hit by the long, dry summer of 2013. The lawn was in very poor condition in certain sections. This topic was discussed at the 2014 Annual Meeting. The homeowners in attendance at the Annual Meeting made it clear that they wanted this lawn area repaired.
This week, the landscaping crew performed some work on this lawn area in the hope of bringing it back. Aeration, overseed and a topdress with soil mix was applied.
But this effort and expenditure of funds will almost certainly fail - if these areas do not receive adequate watering.
Letters were sent to homeowners. Requests were made for volunteers to ensure the watering gets done.
This week, the landscaping crew performed some work on this lawn area in the hope of bringing it back. Aeration, overseed and a topdress with soil mix was applied.
But this effort and expenditure of funds will almost certainly fail - if these areas do not receive adequate watering.
Letters were sent to homeowners. Requests were made for volunteers to ensure the watering gets done.
Sunday, May 18, 2014
Roof vents at our 15 buildings
Roof vents are a requirement according to accepted building codes. Questions have been asked about the roof vents that are installed at our fifteen buildings. At some of our buildings, roof vents are visible, and at other buildings, they are not. But they are still there, it is just that at some buildings, the the type of roof vents used are made to blend in with the roof line.
For example, a, "continuous ridge vent" is installed on Building J. It is "shingle over ridge vent", which makes it hard to see because shingles go over the top of it to make it blend in with the roof system, but it is there. On some of the previous roof installation at other buildings at Kenthill Townhomes, the roof design does not allow for the installation of a continuous ridge vent, as the front and back roof platforms are at different levels. On these buildings, "static" or, "stand alone" roof vents were installed to allow for roof ventilation.
For example, a, "continuous ridge vent" is installed on Building J. It is "shingle over ridge vent", which makes it hard to see because shingles go over the top of it to make it blend in with the roof system, but it is there. On some of the previous roof installation at other buildings at Kenthill Townhomes, the roof design does not allow for the installation of a continuous ridge vent, as the front and back roof platforms are at different levels. On these buildings, "static" or, "stand alone" roof vents were installed to allow for roof ventilation.
Sunday, April 27, 2014
2014 Roof Installation - the last building to have a new roof installed
This is a picture of the roof installation which occurred at Building J this week. The Kenthill Townhomes Roof Installation Project began in 2003. We have fifteen buildings. Three competitive bids were obtained at that time. A list was made of the buildings, in order, with those buildings which had roofs that were in the poorest condition, being at the top of the list. The plan was to have two new roofs installed, each year, until the project was completed. But some timeouts occurred over the years. Some wood siding dry rot issues had to be addressed at certain buildings.
Building J was the last building. So this marks the conclusion of the project.
It should be noted that for Kenthill Townhomes, unlike numerous other condominium complexes throughout the area, Special Assessments (often used for projects such as this one) are very rare, (the last one being in 2002).
Building J was the last building. So this marks the conclusion of the project.
It should be noted that for Kenthill Townhomes, unlike numerous other condominium complexes throughout the area, Special Assessments (often used for projects such as this one) are very rare, (the last one being in 2002).


