Search this blog!

Search kenthillwebblog

Saturday, May 15, 2010

2010 dry rot repairs


Significant dry rot continues to be discovered at our buildings. In order to address this dry rot (where the roof line meets the vertical wood siding on the building), wood siding repairs are being accomplished at Buildings M, K, and O. This is a picture of the dry rot repairs occurring at Building M.

Saturday, May 01, 2010

Paint job in the future


The long term projects of Kenthill Townhomes have been reviewed. Kenthill Townhomes received a painting job in 2002 (it was of poor quality). Another painting project will need to be scheduled in the future, but sooner than within a 15 year time span (well before 2017).